Grade 6 · Earth science and engineering design unit
A hurricane warning, a dark classroom and a tank full of fish. Students design the plan that gets them through.
Grade 62 weeks · 4 sessions5E formatCCSS 6.RP.A.3
For teachers
Teacher Edition
10 pages
Lesson plan, prep guide, answer keys, sample data, 16-point rubric with HĀ column, family letter, administrator form.
For students
Student Edition
14 pages
8 activity sheets, Backup Option Cards, Lab Crew Job Chart, Storm-Ready Checklist poster, take-home family storm kit page.
The unit in brief
Overview
Students treat a hurricane warning as an engineering problem. They read how forecasters see storms coming days ahead, list every part of the system that needs electricity, and work out what fails first when the power goes out. They write precise criteria and constraints for a backup plan, test real backup options (a battery air pump, hand-pour aeration and a solar DC pump), and use the data to build and pitch a Storm-Ready Plan with a before, during and after checklist that hangs beside the tank.
Driving question: A hurricane is coming and the power could be out for days. How do we keep our fish and plants alive?
Safety and approval: No handling of fish. All backup tests use buckets of tap water away from the system, and only the teacher handles batteries and connections. No generators or fuel at school, and no plan may require anyone at school during a storm. Handle storm topics with care for students who have lived through disasters.
Planning details
Lesson at a Glance
Grade
6
Length
2 weeks
4 sessions
Session time
50, 60 or 75 min
Format
5E
Engage, Explore, Explain, Elaborate, Evaluate
Math
CCSS 6.RP.A.3 (rates)
NGSS standards
MS-ESS3-2 (anchor), MS-ETS1-1, MS-ETS1-2
HĀ outcomes
Responsibility and Hawaiʻi lead; all six outcomes in Session 4
System
Classroom aquaponics system; battery air pump in a bucket of tap water; pitchers and buckets for hand-pour aeration; solar panel and 12 V DC pump from Power the Pump
Hands-on activities
What Students Will Do
✓Read a Central Pacific Hurricane Center forecast graphic and explain hurricane watches and warnings
✓Find every part of the system that needs electricity and rank what fails first
✓Write measurable criteria and constraints for a backup plan
✓Log how long a battery air pump runs, time hand-pour aeration, and test a solar pump in sun and cloud
✓Compare backups using rates and decide which can get the fish through a night
✓Build and pitch a before, during and after Storm-Ready checklist
✓Take home a family storm kit checklist
Hawaiʻi connection
Kilo: Watching the Sky Before the Storm
Hurricane season in the Central Pacific runs from June 1 to November 30, and Hurricane ʻIniki struck Kauaʻi as a Category 4 storm in 1992. Students connect forecasting to the Hawaiian practice of kilo, careful watching of clouds, wind and ocean, and to fishpond walls built to ride out storm days. They bring the work home with the Department of Health’s 14-day family kit.
4 sessions over 2 weeks
Sessions
01
When the Lights Go Out
02
Criteria and Constraints
03
Test the Backups
04
Our Storm-Ready Plan
References
Sources
- Next Generation Science Standards, MS-ESS3-2 and MS-ETS1 Engineering Design (nextgenscience.org)
- NOAA National Hurricane Center, Glossary of NHC Terms: Hurricane Watch and Hurricane Warning (nhc.noaa.gov)
- Hawaiʻi State Department of Health, Hurricane Season advisory (health.hawaii.gov)
- NOAA Atlantic Oceanographic and Meteorological Laboratory, 25th Anniversary of Hurricane Iniki (aoml.noaa.gov)
- Somerville, C., Cohen, M., Pantanella, E., Stankus, A. and Lovatelli, A., Small-scale aquaponic food production, FAO Fisheries and Aquaculture Technical Paper 589, Food and Agriculture Organization of the United Nations, 2014
- J. M. Ebeling and P. Hightower, Backup oxygen, power systems essential insurance, Global Aquaculture Advocate, March/April 2010 (globalseafood.org)
- Wai Gardens, Power the Pump and Chasing Light (Grade 5 units)
- Hawaiʻi Board of Education Policy E-3, Nā Hopena Aʻo (HĀ), 2015
Note for teachers: Print a forecast graphic from the Central Pacific Hurricane Center archive for a past storm before Session 1, and start the battery air pump before Session 3. The backup tests have not been trial-run. Prices on the Backup Option Cards are placeholders. Sample data in the Teacher Edition are invented for planning.
Free for teachers
Before you download
Tell us who you are once and your downloads will start right away from then on in this browser. We would love to hear how the lesson went, so check the box if it is OK for us to follow up by email.
